{"type":"line","id":601,"names":{"en":"Allington Junction to Barkston East Junction Spur (Allington Junction–mileage change)"},"data":"https://rosenlog.jp/gb/lines/601.json","country":"gb","retired":false,"operator":{"names":{"en":"Network Rail"}},"mode":"rail","high_speed":false,"length_m":6621,"runs":[{"piece":0,"branches_from":null,"stations":[]}],"services":[{"type":"service","id":2622,"names":{"en":"East Midlands Railway Nottingham – Skegness"},"data":"https://rosenlog.jp/gb/services/2622.json","shared_m":5915}],"through_running":[{"line":{"type":"line","id":1191,"names":{"en":"Grantham and Skegness Line (112MP–Boston Sleaford Line Junction)"},"data":"https://rosenlog.jp/gb/lines/1191.json"},"at":null},{"line":{"type":"line","id":1613,"names":{"en":"Nottingham to Grantham Line (Grantham–Netherfield mileage change)"},"data":"https://rosenlog.jp/gb/lines/1613.json"},"at":null}],"pages":{"en":"https://rosenlog.jp/en/gb/lines/601-allington-junction-to-barkston-east-junction-spur-allington-junction-mileage-change","ja":"https://rosenlog.jp/ja/gb/lines/601-allington-junction-to-barkston-east-junction-spur-allington-junction-mileage-change"},"credits":{"en":"https://rosenlog.jp/en/credits","ja":"https://rosenlog.jp/ja/credits"}}